What Happened To GM's Dual Charing Port System Design?
Replenishing massive electric vehicle battery packs, like the 200-plus kilowatt-hour one found in the GMC Hummer EV, can be a time-consuming process.
To make charging faster and more versatile, General Motors has a patent detailing a dual-charging-port system designed to work with the automaker's double-layer battery architecture.
The battery pack in GM’s largest electric trucks and SUVs is composed of two distinct ~100 kWh layers stacked on top of each other. Through internal switches and control software, the two layers can operate in series as a single 800-volt battery or in parallel as two separate 400-volt packs. Adding a secondary charge port introduces several functional scenarios for managing power delivery.
Under a single high-speed charging scenario, plugging an 800-volt DC fast-charging cable into the primary port recharges the entire pack in series at maximum voltage. However, if an ultra-fast 800-volt charger is unavailable, the system can connect to two separate 400-volt charging cables simultaneously. In this configuration, the battery operates in parallel, drawing power from both stations at once to significantly cut recharge times.
The dual-port setup also expands bidirectional power capability. A vehicle could draw 800-volt fast-charging power through its main port while using the secondary port to simultaneously output 400-volt electricity to power jobsite tools or recharge another electric vehicle.
Looking further ahead, GM’s patent outlines upgrading both ports to support simultaneous 800-volt charging, establishing the framework for ultra-high-power energy transfer on future commercial models.
While dual charge ports remain a patent-stage concept for passenger vehicles like the Hummer EV and Chevrolet Silverado EV, the technology offers significant value for commercial electrification. Large commercial vehicles such as semi-trucks and heavy dump trucks require immense battery capacities that can strain single-port charging setups. By virtually splitting the battery pack into two isolated circuits, fleet operators could maximize vehicle uptime using existing charging infrastructure.
More by Albert Garcia
Comments
Join the conversation